Porta Cabins and Site Offices

Twenty cabins a month, built to last longer than the project.

Not a throwaway box

Villa-grade steel, cabin turnaround.

Most porta cabins in this market are bought to survive one contract. Ours are framed in the same certified galvanised steel we use for permanent villas, which means they are still square and still serviceable when the project ends and they move to the next site.

We produce up to twenty complete units a month. For a standard 43 to 50 square metre cabin, we complete the design in a single day, begin production the day after your approval, and finish fabrication within two to three days.

That speed comes from owning four machines and detailing in-house. There is no queue behind another company's order.

What we provide

A finished unit, not a shell.

  • 01Layout design and structural detailing
  • 02Complete steel frame fabrication
  • 03Insulated wall and roof panels
  • 04Doors, windows and hardware
  • 05Electrical installation, lighting and power points
  • 06Plumbing and sanitary fit-out where specified
  • 07Internal finishes and flooring
  • 08Delivery to site
  • 09Positioning, levelling and connection
  • 10Handover ready for occupation

Typical applications

One frame, many uses.

Site offices and project management units

Labour accommodation

Security cabins and gatehouses

Welfare, mess and ablution units

Stores and workshops

Clinics and first aid rooms

Key facts

The numbers.

Output
Up to 20 complete units per month
Standard cabin
43–50 sq m, fabricated in 2–3 days
Configuration
Single, double or multi-unit assemblies
Structure
Certified G550 galvanised steel

Get cabins moving

Need cabins on site fast? Let’s talk.

Tell us the type, the quantity and when you need them. We will come back with a specification, price and delivery date.

info@amaf.ae · +971 55 669 7693